With the floor successfully replaced we were ready to start framing the front. The first thing to do was to replace the rotted wood from the side framing.
Unfortunately, we could see that the water had damaged the bottom of the floor joists for a way along their length. Replacing the floor was not in my plan!
The next thing I needed to deal with was the roof. The rotten wood framing inside the trailer was proof that water was getting in and the roof was suspect.
I dove in and went full-on Destruction Mode. I ripped and tore and pried. I spent days manhandling all of that luan and I was really glad it wasn't hot.